Cuenta Contacto
Tu carrito
Envío con DPD y FedEx
¿Dudas? Pregunte a la IA

Whirlpool WPS D8 WBS EE secadora con bomba de calor 8 kg carga frontal blanco

Whirlpool WPS D8 WBS EE secadora con bomba de calor 8 kg carga frontal blanco
Whirlpool WPS D8 WBS EE secadora con bomba de calor 8 kg carga frontal blanco
Whirlpool WPS D8 WBS EE secadora con bomba de calor 8 kg carga frontal blanco
Whirlpool WPS D8 WBS EE secadora con bomba de calor 8 kg carga frontal blanco
Whirlpool WPS D8 WBS EE secadora con bomba de calor 8 kg carga frontal blanco
Whirlpool WPS D8 WBS EE secadora con bomba de calor 8 kg carga frontal blanco
Whirlpool WPS D8 WBS EE secadora con bomba de calor 8 kg carga frontal blanco
Whirlpool WPS D8 WBS EE secadora con bomba de calor 8 kg carga frontal blanco
Whirlpool WPS D8 WBS EE secadora con bomba de calor 8 kg carga frontal blanco
Whirlpool WPS D8 WBS EE secadora con bomba de calor 8 kg carga frontal blanco
547,17 €
The Whirlpool WPS D8 WBS EE is a front loading heat pump dryer with an 8 kg drying capacity and a white finish. It features a digital display, delayed start timer, child lock, drum interior light and viewing window.Key featuresHeat pump drying system8 kg drying capacityFront loading designDigital di... Leer más
Stock 7 Código 2833404 Marca WHIRLPOOL Modelo WPS D8 WBS EE Garantía 2 años

Envíos y devoluciones

Entrega estimada Viernes, Octubre 16
Te mantendremos informado a través de nuestro sistema de seguimiento detallado
Opciones de pago
Tarjeta bancariaVisaMastercardPayPalApple PayGoogle PayTransferencia bancaria

The Whirlpool WPS D8 WBS EE is a front loading heat pump dryer with an 8 kg drying capacity and a white finish. It features a digital display, delayed start timer, child lock, drum interior light and viewing window.

Key features

  • Heat pump drying system
  • 8 kg drying capacity
  • Front loading design
  • Digital display
  • Delayed start timer up to 24 hours
  • Child lock
  • Drum interior light
  • Viewing window

Specifications

  • Brand: Whirlpool
  • Model: WPS D8 WBS EE
  • MPN: 925004190
  • Product colour: White
  • Device type: Front loading
  • Drying system: Heat pump
  • Drying capacity: 8 kg
  • Energy efficiency class: D
  • Annual energy consumption: 119 kWh
  • Energy consumption per 100 cycles: 119 kWh
  • Noise level (max): 64 dB
  • Sound level (drying class): B
  • Power: 900 W
  • Width: 60 cm
  • Height: 85 cm
  • Depth: 55 cm
  • Drum volume: 92 L
  • Display: Yes
  • Display type: Digital
  • Delayed start timer: Yes
  • Delay start (max): 24 h
  • Child lock: Yes
  • Drum interior light: Yes
  • Viewing window: Yes
  • Steam function: No
  • Self-cleaning: No
  • Eco program duration: 3:17
Aspectos destacados
  • Freestanding Front-load 8 kg 93 L White
  • Heat pump
  • Built-in display
  • Anti-Crease function Moisture sensor Delayed start timer
  • Energy efficiency class: D
  • 900 W 220.2 kWh 64 dB
Especificaciones
Categoría
Tumble Dryers
Color del producto
White
EAN
8003437065002
Marca
Whirlpool
Modelo
925004190
MPN
925004190

Folleto

Abrir documento
Historial de precios de los últimos 6 meses
Whirlpool WPS D8 WBS EE secadora con bomba de calor 8 kg carga frontal blanco
Actual
547,17 €
Mínimo
505,80 €
Máximo
1.489,39 €
Variación 24 h
+39,36 €   +8%
Semana
+38,28 €   +8%
Mes
+40,54 €   +8%
Hola, soy el asistente de IA de DistriNode. Puedo ayudarte a encontrar productos, comparar opciones, crear presupuestos en PDF o abrir solicitudes de soporte.